2, The Moorings, Cadnant Road, Menai Bridge, LL59 5NH
This is not a sales listing. Propbar data is compiled for informational purposes.
Property Information
3-bedroom flat at 2, The Moorings, Cadnant Road, Menai Bridge, LL59 5NH. Sale status: live. Currently listed at £375,000. The property featuring 3 bedrooms, 2 bathrooms, with 163m² floor area. EPC rating C indicates good energy efficiency. Local shopping convenience includes Waitrose Menai, Morrisons Bangor, Asda Bangor, Lidl Bangor, M&S Menai Bangor SF. Transport connectivity features Bangor Railway Station, Llanfairpwll Railway Station, with Bangor Railway Station approximately 1.9km from the property
Sale Information
Current Sale
Last Sold
Discover AI Insights
- Price Comparison
- Instantly compare across similar listings
- AI Price Valuation
- Get an AI-powered valuation in seconds
Let Information
Current Let
Last Let
Discover AI Insights
- AI Price Valuation
- Get an AI-powered valuation in seconds
Financials
| Estimated Rental Yield | N/A |
|---|---|
| Stamp Duty | £9,000 |
| Cash Needed Estimate | £70,518 |
| Ground Rent | N/A |
|---|---|
| Service Charge | N/A |
| Council Tax Band | N/A |
| Council Tax (Annual) | N/A |
| Deposit | N/A |
|---|---|
| Mortgage Amount | N/A |
| Term Length | N/A |
| Interest Rate | N/A |
| Repayment | N/A |
Propbar Assessment
Instant Environmental & Planning Assessment
See flood risks, planning constraints, noise levels and crime data instantly - data that normally takes days and costs £100+
- Flood risk analysis
- Protected designations & listed buildings
- Road & rail noise levels
- Crime risk data
- Connectivity scores

Planning Constraints 1
- Flood RiskRedacted
- Listed BuildingRedacted
- Ramsar SiteRedacted
- Area of Outstanding Natural BeautyRedacted
- Protected WoodlandRedacted
- Protected Nature ReserveRedacted
- Built-up AreaRedacted
Noise
- Road NoiseRedacted
- Rail NoiseRedacted
Safety 1
- Crime RiskRedacted
Broadband 2
- Mobile CoverageRedacted
- Fixed BroadbandRedacted
Energy & Compliance 3
- MEES ComplianceRedacted
- ECO4/GBIS Grant EligibilityRedacted
- 2030 EPC B RequirementRedacted
- Green Mortgage BenefitsRedacted